#MakeInIndia – the future is bright. India’s total installed solar capacity expected to reach 18 GW by 2017 end. https://t.co/yGoT8ir2jg
$l10n
parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script()
function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /var/www/wp-includes/functions.php on line 6085#MakeInIndia – the future is bright. India’s total installed solar capacity expected to reach 18 GW by 2017 end. https://t.co/yGoT8ir2jg